Live in another state? See all our Solar Incentives by
State
All of District of Columbia can take advantage of the 26%
Federal Tax Credit, which will allow you to recoup 26% of
your equipment AND installation costs for an unlimited amount.
There may still be other local rebates from your city, county, or utility. Check below!
District of Columbia Solar PV Rebates & Incentives
Data from DSIRE. Last updated: 05/24/2022
Name | Administrator | Budget | Last Updated | End Date | DSIRE ID | Summary | ||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Business Energy Investment Tax Credit (ITC) | U.S. Internal Revenue Service | 02/24/21 | 05/24/22 | 658 | Note: The Taxpayer Certainty and Disaster Tax Relief Act of 2020, signed in December 2020, extended the phase out of this tax credit for certain technologies. The bill also provides a 30% tax credit for offshore wind facilities in inland navigable waters or coastal waters of the United States for which construction commences prior to 2026. The federal Business Energy Investment Tax Credit (ITC) has been amended a number of times, most recently in December 2020. The table below shows the value of the investment tax credit for each technology by year. The dates are based on when construction begins.
In general, the original use of the equipment must begin with the taxpayer, or the system must be constructed by the taxpayer. The equipment must also meet any performance and quality standards in effect at the time the equipment is acquired. The energy property must be operational in the year in which the credit is first taken. | |||||||||||||||||||||||||||||||||||||||||||||||||
Residential Energy Conservation Subsidy Exclusion (Personal) | U.S. Internal Revenue Service | 05/16/18 | 05/24/22 | 666 | According to Section 136 of the U.S. Code, energy conservation subsidies provided (directly or indirectly) to customers by public utilities* are non-taxable. This exclusion does not apply to electricity-generating systems registered as "qualifying facilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA). If a taxpayer claims federal tax credits or deductions for the energy conservation property, the investment basis for the purpose of claiming the deduction or tax credit must be reduced by the value of the energy conservation subsidy (i.e., a taxpayer may not claim a tax credit for an expense that the taxpayer ultimately did not pay). The term "energy conservation measure" includes installations or modifications primarily designed to reduce consumption of electricity or natural gas, or to improve the management of energy demand. Eligible dwelling units include houses, apartments, condominiums, mobile homes, boats and similar properties. If a building or structure contains both dwelling units and other units, any subsidy must be properly allocated. The definition of "energy conservation measure" implies that utility rebates for residential solar-thermal projects and photovoltaic (PV) systems may be non-taxable. However, the IRS has not ruled definitively on this issue. Taxpayers considering using this provision for a renewable energy system should discuss the details of the project with a tax professional. Other types of utility subsidies that may come in the form of credits or reduced rates might also be non-taxable, according to IRS Publication 525. | |||||||||||||||||||||||||||||||||||||||||||||||||
Modified Accelerated Cost-Recovery System (MACRS) | U.S. Internal Revenue Service | 08/21/18 | 05/24/22 | 676 | Note: The Tax Cuts and Jobs Act of 2017 increased bonus depreciation to 100% for qualified property acquired and placed in service after September 27, 2017 and before January 1, 2023. Under the federal Modified Accelerated Cost-Recovery System (MACRS), businesses may recover investments in certain property through depreciation deductions. The MACRS establishes a set of class lives for various types of property, ranging from three to 50 years, over which the property may be depreciated. A number of renewable energy technologies are classified as five-year property (26 USC § 168(e)(3)(B)(vi)) under the MACRS, which refers to 26 USC § 48(a)(3)(A), often known as the energy investment tax credit or ITC to define eligible property. Such property currently includes*:
In addition, for certain other types of renewable energy property, such as biomass or marine and hydrokinetic property, the MACRS property class life is seven years. Eligible biomass property generally includes assets used in the conversion of biomass to heat or to a solid, liquid or gaseous fuel, and to equipment and structures used to receive, handle, collect and process biomass in a waterwall, combustion system, or refuse-derived fuel system to create hot water, gas, steam and electricity. Marine and hydrokinetic property includes facilities that utilize waves, tides, currents, free-flowing water, or differentials in ocean temperature to generate energy. It does not include traditional hydropower that uses dams, diversionary structures, or impoundments.
Bonus Depreciation Bonus Depreciation History
The 50% first-year bonus depreciation provision enacted in 2008 was extended (retroactively for the entire 2009 tax year) under the same terms by the American Recovery and Reinvestment Act of 2009 (H.R. 1), enacted in February 2009. It was renewed again in September 2010 (retroactively for the entire 2010 tax year) by the Small Business Jobs Act of 2010 (H.R. 5297). In December 2010 the provision for bonus depreciation was amended and extended yet again by the Tax Relief, Unemployment Insurance Reauthorization, and Job Creation Act of 2010 (H.R. 4853). Under these amendments, eligible property placed in service after September 8, 2010 and before January 1, 2012 was permitted to qualify for 100% first-year bonus depreciation. The December 2010 amendments also permitted bonus depreciation to be claimed for property placed in service during 2012, but reverted the allowable amount from 100% to 50% of the eligible basis. The 50% first-year bonus depreciation allowance was further extended for property placed in service during 2013 by the American Taxpayer Relief Act of 2012 (H.R. 8, Sec. 331) in January 2013. The Tax Increase Prevention Act Of 2014 (H.R. 5771, Sec. 125), extended these provisions through to December 31, 2014, and thus retroactively for the 2014 tax year. | |||||||||||||||||||||||||||||||||||||||||||||||||
Residential Energy Conservation Subsidy Exclusion (Corporate) | U.S. Internal Revenue Service | 05/16/18 | 05/24/22 | 727 | According to Section 136 of the U.S. Code, energy conservation subsidies provided (directly or indirectly) to customers by public utilities* are non-taxable. This exclusion does not apply to electricity-generating systems registered as "qualifying facilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA). If a taxpayer claims federal tax credits or deductions for the energy conservation property, the investment basis for the purpose of claiming the deduction or tax credit must be reduced by the value of the energy conservation subsidy (i.e., a taxpayer may not claim a tax credit for an expense that the taxpayer ultimately did not pay). The term "energy conservation measure" includes installations or modifications primarily designed to reduce consumption of electricity or natural gas, or to improve the management of energy demand. Eligible dwelling units include houses, apartments, condominiums, mobile homes, boats and similar properties. If a building or structure contains both dwelling units and other units, any subsidy must be properly allocated. The definition of "energy conservation measure" implies that utility rebates for residential solar-thermal projects and photovoltaic (PV) systems may be non-taxable. However, the IRS has not ruled definitively on this issue. Taxpayers considering using this provision for a renewable energy system should discuss the details of the project with a tax professional. Other types of utility subsidies that may come in the form of credits or reduced rates might also be non-taxable, according to IRS Publication 525. | |||||||||||||||||||||||||||||||||||||||||||||||||
Renewable Electricity Production Tax Credit (PTC) | U.S. Internal Revenue Service | 01/27/21 | 05/24/22 | 734 | Note: The Taxpayer Certainty and Disaster Tax Relief Act of 2020, signed in December 2020, extended the deadline for eligible systems to qualify for this tax credit. Wind projects started in either 2020 or 2021 will qualify for a production tax credit at 60% of the full rate on the electrical output for 10 years. Tax credits for other technologies may be claimed at the full rate. The federal renewable electricity production tax credit (PTC) is an inflation-adjusted per-kilowatt-hour (kWh) tax credit for electricity generated by qualified energy resources and sold by the taxpayer to an unrelated person during the taxable year. The duration of the credit is 10 years after the date the facility is placed in service for all facilities placed in service. Originally enacted in 1992, the PTC has been renewed and expanded numerous times, most recently by the Taxpayer Certainty and Disaster Relief Act of 2020. Amount The tax credit amount is $0.015 per kWh in 1993 dollars for some technologies and half of that amount for others. The amount is adjusted for inflation by multiplying the tax credit amount by the inflation adjustment factor for the calendar year in which the sale occurs, rounded to the nearest 0.1 cents. The Internal Revenue Service (IRS) publishes the inflation adjustment factor no later than April 1 each year in the Federal Register. For 2020, the inflation adjustment factor used by the IRS is 1.6687. Earlier legislation introduced a step down of the credit amount for wind, while phasing out the credit for other technologies. Subsequent legislation has pushed back the stepdown for wind and the phase out for other technologies. As such, the credit today includes a 40% step-down in the credit amount for wind, but other technologies can receive the full credit amount. Applying the inflation-adjustment factor for the 2020 calendar year, and the 40% step-down for wind, the production tax credit amount is as follows:
Duration The duration of the credit is 10 years after the date the facility is placed in service. Two exceptions applied to facilities placed in service more than a decade ago:
Investment Tax Credit in Lieu of Claiming the PTC Renewable energy facilities placed in service after 2008 and commencing construction prior to 2018 (or 2020 for wind facilities) may elect to make an irrevocable election to claim the Investment Tax Credit (ITC) in lieu of the PTC. Wind facilities making such an election will have the ITC amount reduced by the same phase-down specified above for facilities commencing construction in 2017, 2018, or 2019. Process for Claiming The credit is claimed by completing Form 8835, "Renewable Electricity Production Credit," and Form 3800, "General Business Credit." For more information, contact IRS Telephone Assistance for Businesses at 1-800-829-4933. Determination of Commencing Construction To claim the PTC, construction on an eligible project must have “commenced construction” prior to January 1, 2015. The IRS has issued guidance on how it will evaluate whether construction has commenced in IRS Notices 2013-29, 2013-60, 2014-46, 2015-25, and 2016-31 (please see the full text of these notices for complete information on determining the commencing of construction). The guidelines establish two methods—a “physical work” test and a 5% safe harbor (see sections below for details)—to determine when construction has begun on a qualified facility. Meeting the criteria of either method is sufficient to demonstrate that construction has commenced. Both methods require that a taxpayer make continuous progress towards completion once construction has begun by meeting the Continuous Construction Test (to satisfy the Physical Work Test) or the Continuous Efforts Test (to satisfy Safe Harbor). If a taxpayer places a facility in service during a calendar year that is no more than four calendar years after the calendar year during which construction of the facility began, the facility will be considered to satisfy the Continuity Safe Harbor Physical Work Test The physical work test provides that a taxpayer may establish the beginning of construction by beginning "physical work of a significant nature.” The physical work test is based on the nature of the work performed rather than the cost of the work; if the work performed is of a significant nature, then “there is no fixed minimum amount of work or monetary or percentage threshold required to satisfy the Physical Work Test” (Notice 2014-46). Notice 2013-29 provides several examples of actions that constitute work of a significant nature, including:
Safe Harbor Safe Harbor with respect to a facility is demonstrated by showing that 5% or more of the total cost of the facility was paid or incurred. | |||||||||||||||||||||||||||||||||||||||||||||||||
Energy-Efficient Mortgages | 08/05/20 | 05/24/22 | 742 |
Homeowners can take advantage of energy efficient mortgages (EEM) to either finance energy efficiency improvements to existing homes, including renewable energy technologies, or to increase their home buying power with the purchase of a new energy efficient home. The U.S. federal government supports these loans by insuring them through Federal Housing Authority (FHA) or Veterans Affairs (VA) programs. This allows borrowers who might otherwise be denied loans to pursue energy efficiency, and it secures lenders against loan default.
Loan amounts may not exceed the projected savings of the energy efficiency improvements. These loans may be combined with FHA 203 (h) mortgages available to victims of presidentially-declared disasters and with financing offered through the FHA 203 (k) rehabilitation program. FHA loan limits do not apply to the EEM. Borrowers must obtain a home energy assessment by a qualified energy rater, assessor, or auditor using whole-assessment standards, protocols, and procedures.
ENERGY STAR Partnership for Lenders | ||||||||||||||||||||||||||||||||||||||||||||||||||
USDA - Rural Energy for America Program (REAP) Grants | U.S. Department of Agriculture | $600 million for FY 2018 | 08/21/18 | 05/24/22 | 917 | Note: The U.S. Department of Agriculture's Rural Development issues periodic Notices of Solicitation of Applications for the Rural Energy for America Program (REAP) in the Federal Register. The FY 2018 solicitation for the REAP program includes a total budget of approximately $800 million. The Rural Energy for America Program (REAP) provides financial assistance to agricultural producers and rural small businesses in America to purchase, install, and construct renewable energy systems, make energy efficiency improvements to non-residential buildings and facilities, use renewable technologies that reduce energy consumption, and participate in energy audits and renewable energy development assistance. Renewable energy projects for the Renewable Energy Systems and Energy Efficiency Improvement Guaranteed Loan and Grant Program include wind, solar, biomass and geothermal, and hydrogen derived from biomass or water using wind, solar, or geothermal energy sources. These grants are limited to 25% of a proposed project's cost, and a loan guarantee may not exceed $25 million. The combined amount of a grant and loan guarantee must be at least $5,000 (with the grant portion at least $1,500) and may not exceed 75% of the project’s cost. In general, a minimum of 20% of the funds available for these incentives will be dedicated to grants of $20,000 or less. For more information on grant, loan guarantees, loan financing, and opportunities for combinations thereof, visit the USDA website. Application due dates are published annually in the Notice of Funding Availability. Eligibility Grants and Guaranteed Loans are generally available to small businesses and agricultural producers and other entities as determined by USDA. To be eligible for REAP grants and guaranteed loans, applicants must demonstrate sufficient revenue to cover any operations and maintenance expense as well as any applicable debt service of the project for the duration of the guaranteed loan or grant. Rural small businesses must be located in rural areas, but agricultural producers may be located in non-rural areas. Eligible project costs include purchasing energy efficiency improvements or a renewable energy system, energy audits or assessments, permitting and licensing fees, and business plans and retrofitting. For new construction the replacement of older equipment with more efficient equipment may be eligible as a project cost only when a new facility is planned to be more efficient and similarly sized than the older facility. Working capital and land acquisition are only eligible for loan guarantees. For more information regarding applicant and project eligibility for loans and grants, visit the USDA REAP eligibility webpage, read the eligibility requirements in the most recent Solicitation of Applications for REAP funding in the Federal Registry, and/or contact your state rural energy coordinator. Regional rural energy coordinators provide loan and grant applications upon request. History
The Food, Conservation, and Energy Act of 2008 (H.R. 2419), enacted by Congress in May 2008, converted the federal Renewable Energy Systems and Energy Efficiency Improvements Program,* into the Rural Energy for America Program (REAP). Similar to its predecessor, the REAP promotes energy efficiency and renewable energy for agricultural producers and rural small businesses through the use of (1) grants and loan guarantees for energy efficiency improvements and renewable energy systems, and (2) grants for energy audits and renewable energy development assistance. Congress has allocated funding for the new program in the following amounts: $55 million for FY 2009, $60 million for FY 2010, $70 million for FY 2011, and $70 million for FY 2012. REAP is administered by the U.S. Department of Agriculture (USDA). In addition to these mandatory funding levels, up to $25 million in discretionary funding may be issued each year. The American Taxpayer Relief Act of 2012 (H.R. 8) extended discretionary funding for FY 2013. The 2014 Farm Bill reauthorized the USDA to offer these programs and removed the mandate to offer grants for feasibility studies. | ||||||||||||||||||||||||||||||||||||||||||||||||
Office of Indian Energy Policy and Programs - Funding Opportunities | U.S. Department of Energy | 02/26/20 | 05/24/22 | 918 | The U.S. Department of Energy's (DOE) Office of Indian Energy Policy and Programs promotes tribal energy sufficiency, economic growth, and employment on tribal lands through the development of renewable energy and energy efficiency technologies. The program provides financial assistance, technical assistance, and education and training to tribes for the evaluation and development of renewable energy resources and energy efficiency measures. DOE's program offerings consist of program management through DOE headquarters, program implementation and project management through DOE's field offices, and technical support through DOE laboratories. Program management is carried out by DOE's Weatherization and Intergovernmental Program, which provides programmatic direction and funding to DOE field offices for program implementation. DOE's Golden Field Office solicits, awards, administers, and manages financial assistance agreements. Program funding is awarded through a competitive process. Click here to view current program funding opportunities, and here to apply for technical assistance. | |||||||||||||||||||||||||||||||||||||||||||||||||
Residential Renewable Energy Tax Credit | U.S. Internal Revenue Service | 03/15/21 | 12/31/23 | 1235 | Note: The Taxpayer Certainty and Disaster Tax Relief Act of 2020, signed in December 2020, extended the phase out of this tax credit. A taxpayer may claim a credit for a system that serves a dwelling unit located in the United States that is owned and used as a residence by the taxpayer. Expenditures with respect to the equipment are treated as made when the installation is completed. If the installation is at a new home, the "placed in service" date is the date of occupancy by the homeowner. Expenditures include labor costs for on-site preparation, assembly or original system installation, and for piping or wiring to interconnect a system to the home. If the federal tax credit exceeds tax liability, the excess amount may be carried forward to the succeeding taxable year. The maximum allowable credit, equipment requirements and other details vary by technology, as outlined below. Solar-electric property
Solar water-heating property
Fuel cell property
Small wind-energy property
Geothermal heat pumps
Biomass Heaters
Significantly, The American Recovery and Reinvestment Act of 2009 repealed a previous limitation on the use of the credit for eligible projects also supported by "subsidized energy financing." For projects placed in service after December 31, 2008, this limitation no longer applies. Energy Storage The federal tax code does not explicitly reference energy storage, so stand-alone energy storage systems do not qualify for the tax credit. However, the IRS issued Private Letter Rulings in 2013 and 2018, which address energy storage paired with PV systems. In both cases, the IRS ruled that the energy storage equipment when paired with PV met the statutory definition of a "qualified solar electric property expenditure," as was eligible for the tax credit. It is important to note that Private Letter Rulings only apply to the taxpayer who requested it, and do not establish precedent. Any taxpayer considering the purchase of an energy storage system should consult their accountant or other tax professional before claiming a tax credit. History Established by The Energy Policy Act of 2005, the federal tax credit for residential energy property initially applied to solar-electric systems, solar water heating systems and fuel cells. The Energy Improvement and Extension Act of 2008 extended the tax credit to small wind-energy systems and geothermal heat pumps, effective January 1, 2008. Other key revisions included an eight-year extension of the credit to December 31, 2016; the ability to take the credit against the alternative minimum tax; and the removal of the $2,000 credit limit for solar-electric systems beginning in 2009. The credit was further enhanced in February 2009 by The American Recovery and Reinvestment Act of 2009, which removed the maximum credit amount for all eligible technologies (except fuel cells) placed in service after 2008. | |||||||||||||||||||||||||||||||||||||||||||||||||
Clean Renewable Energy Bonds (CREBs) | U.S. Internal Revenue Service | 08/15/18 | 05/24/22 | 2510 | Note: The Tax Cuts and Jobs Act of 2017 repealed section 54C of the Internal Revenue Code, which authorized the use of New CREBs. IRS Notice 2018-15 announced that the IRS will no longer process applications for or issue allocations of New CREBs. The summary below describes CREBs before they were repealed, and is here for historical purposes only.
Clean renewable energy bonds (CREBs) may be used by certain entities -- primarily in the public sector -- to finance renewable energy projects. The list of qualifying technologies is generally the same as that used for the federal renewable energy production tax credit (PTC). CREBs may be issued by electric cooperatives, government entities (states, cities, counties, territories, Indian tribal governments or any political subdivision thereof), and by certain lenders. The bondholder receives federal tax credits in lieu of a portion of the traditional bond interest, resulting in a lower effective interest rate for the borrower.* The issuer remains responsible for repaying the principal on the bond. The tax credit rate is set daily by the U.S. Treasury Department. Under past allocations, the credit could be taken quarterly on a dollar-for-dollar basis to offset the tax liability of the bondholder. However, under the new CREBs allocation, the credit has been reduced to 70% of what it would have been otherwise. Other important changes are described in IRS Notice 2009-33. | |||||||||||||||||||||||||||||||||||||||||||||||||
USDA - Rural Energy for America Program (REAP) Loan Guarantees | U.S. Department of Agriculture | 08/21/18 | 05/24/22 | 2511 | The Rural Energy for America Program (REAP) provides financial assistance to agricultural producers and rural small businesses in rural America to purchase, install, and construct renewable energy systems, make energy efficiency improvements to non-residential buildings and facilities, use renewable technologies that reduce energy consumption, and participate in energy audits and renewable energy development assistance. Renewable energy projects for the Renewable Energy Systems and Energy Efficiency Improvement Guaranteed Loan and Grant Program include wind, solar, biomass and geothermal, and hydrogen derived from biomass or water using wind, solar, or geothermal energy sources. These grants are limited to 25% of a proposed project's cost, and a loan guarantee may not exceed $25 million. The combined amount of a grant and loan guarantee must be at least $5,000 (with the grant portion at least $1,500) and may not exceed 75% of the project’s cost. In general, a minimum of 20% of the funds available for these incentives will be dedicated to grants of $20,000 or less. For more information on grant, loan guarantees, loan financing, and opportunities for combinations thereof, visit the USDA website. Application due dates are published annually in the Notice of Funding Availability. Eligibility Grants and Guaranteed Loans are generally available to small businesses and agricultural producers and other entities as determined by USDA. To be eligible for REAP grants and guaranteed loans, applicants must demonstrate sufficient revenue to cover any operations and maintenance expense as well as any applicable debt service of the project for the duration of the guaranteed loan or grant. Rural small businesses must be located in rural areas, but agricultural producers may be located in non-rural areas. Eligible project costs include purchasing energy efficiency improvements or a renewable energy system, energy audits or assessments, permitting and licensing fees, and business plans and retrofitting. For new construction the replacement of older equipment with more efficient equipment may be eligible as a project cost only when a new facility is planned to be more efficient and similarly sized than the older facility. Working capital and land acquisition are only eligible for loan guarantees. For more information regarding applicant and project eligibility for loans and grants, visit the USDA REAP eligibility webpage, read the eligibility requirements in the most recent Solicitation of Applications for REAP funding in the Federal Registry, and/or contact your state rural energy coordinator. Regional rural energy coordinators provide loan and grant applications upon request. History
The Food, Conservation, and Energy Act of 2008 (H.R. 2419), enacted by Congress in May 2008, converted the federal Renewable Energy Systems and Energy Efficiency Improvements Program,* into the Rural Energy for America Program (REAP). Similar to its predecessor, the REAP promotes energy efficiency and renewable energy for agricultural producers and rural small businesses through the use of (1) grants and loan guarantees for energy efficiency improvements and renewable energy systems, and (2) grants for energy audits and renewable energy development assistance. Congress has allocated funding for the new program in the following amounts: $55 million for FY 2009, $60 million for FY 2010, $70 million for FY 2011, and $70 million for FY 2012. REAP is administered by the U.S. Department of Agriculture (USDA). In addition to these mandatory funding levels, up to $25 million in discretionary funding may be issued each year. The American Taxpayer Relief Act of 2012 (H.R. 8) extended discretionary funding for FY 2013. The 2014 Farm Bill reauthorized the USDA to offer these programs and removed the mandate to offer grants for feasibility studies. | |||||||||||||||||||||||||||||||||||||||||||||||||
U.S. Department of Energy - Loan Guarantee Program | U.S. Department of Energy | 08/18/16 | 05/24/22 | 3071 | Note: President Obama and DOE issued new supplemental guidance for Renewable Energy and Efficient Energy (REEE) Projects that adds $500 million of loan guarantee authority, making the total available approximately $4.5 billion. It also released guidance to clarify the types of Distributed Energy Projects it can support under the Title XVII program. The additional loan guarantee authority was officially available as of October 2015. Section 1703 of Title XVII of the Energy Policy Act (EPAct) of 2005 created the Department of Energy's (DOE's) Loan Guarantee Program. The program was reauthorized and revised by the American Recovery and Reinvestment Act (ARRA) of 2009 by adding Section 1705 to EPAct. The 1705 Program was retired in September 2011, and Loan Guarantees are no longer available under that authority. DOE, however, still has authority to issue Loan Guarantees under the old Section 1703 Program. Under Section 1703, DOE is authorized to issue loan guarantees for projects with high technology risks that "avoid, reduce or sequester air pollutants or anthropogenic emissions of greenhouse gases; and employ new or significantly improved technologies as compared to commercial technologies in service in the United States at the time the guarantee is issued." Loan guarantees are intended to encourage early commercial use of new or significantly improved technologies in energy projects. The loan guarantee program generally does not support research and development projects. Loan guarantees are provided in response to open solicitations. The application is a two part process; applicants that meet the specified requirements laid out in Part I receive an invitation to submit a Part II application. The updated supplemental guidance for Renewable Energy Projects and Energy Efficiency Projects includes an application solicitation schedule, with final Part I and Part II application due dates to November 30, 2016 (extended in a Fifth Supplement released June 2016). Up to $3 billion is available in loan guarantees for projects in renewable energy, efficient end-use, and efficient generation, transmission, and distribution technologies (plus an additional amount that may be imputed based on the credit subsidy cost of the loan guarantee authority). See the program website for more details on eligibility and the application process. Section 1703 requires either an appropriation to cover the Credit Subsidy Cost (the expected long term liability to the Federal Government for providing the loan guarantee), or payment of the Credit Subsidy Cost by the borrower. A credit-based interest rate spread will be added to certain loans receiving a 100% loan guarantee from DOE and financing from the Federal Financing Bank. Rates and more information are available here.
| |||||||||||||||||||||||||||||||||||||||||||||||||
Qualified Energy Conservation Bonds (QECBs) | U.S. Internal Revenue Service | 08/22/18 | 05/24/22 | 3098 | Note: The Tax Cuts and Jobs Act (HR 1) of 2017 repealed the use of tax credit bonds effective January 1, 2018. Issuers of QECBs that elected to receive direct payments from the Treasury issued on or before December 31, 2017, consistent with the Internal Revenue Code (Section 54D), will continue to receive direct payments. The summary presented below is for historical purposes.
The Energy Improvement and Extension Act of 2008, enacted in October 2008, authorized the issuance of Qualified Energy Conservation Bonds (QECBs) that may be used by state, local and tribal governments to finance certain types of energy projects. QECBs are qualified tax credit bonds, and in this respect are similar to new Clean Renewable Energy Bonds or CREBs. The October 2008 enabling legislation set a limit of $800 million on the volume of energy conservation tax credit bonds that may be issued by state and local governments. The American Recovery and Reinvestment Act of 2009, enacted in February 2009, expanded the allowable bond volume to $3.2 billion. In April 2009, the IRS issued Notice 2009-29 providing interim guidance on how the program will operate and how the bond volume will be allocated. Subsequently, H.R. 2847 enacted in March 2010 introduced an option allowing issuers of QECBs and New CREBs to recoup part of the interest they pay on a qualified bond through a direct subsidy from the Department of Treasury. Guidance from the IRS on this option was issued in April 2010 under Notice 2010-35. | |||||||||||||||||||||||||||||||||||||||||||||||||
District of Columbia Property Assessed Clean Energy Financing | Department of the Environment | 12/21/21 | 05/24/22 | 4206 | Note: In 2010, the Federal Housing Finance Agency (FHFA), which has authority over mortgage underwriters Fannie Mae and Freddie Mac, directed these enterprises against purchasing mortgages of homes with a PACE lien due to its senior status above a mortgage. Most residential PACE activity subsided following this directive; however, some residential PACE programs are now operating with loan loss reserve funds, appropriate disclosures, or other protections meant to address FHFA's concerns. Commercial PACE programs were not directly affected by FHFA’s actions, as Fannie Mae and Freddie Mac do not underwrite commercial mortgages. Visit PACENow for more information about PACE financing and a comprehensive list of all PACE programs across the country.
The District of Columbia offers a commercial Property Assessed Clean Energy (PACE) program. PACE financing allows commercial and mulitfamily property owners in the district to borrow money to pay for energy improvements. The amount borrowed is typically repaid via a special assessment on the property over a period of years. In order to receive financing through the commercial PACE program, applicants must first have an energy efficiency audit performed on the property. The audit must show energy cost savings that can reasonably be expected to equal or exceed the cost of the improvements and interest on the loan. Reasonable costs of any energy audit may be included in the amount of the loan upon request by the applicant. In receiving a loan, the participant agrees to pay a special assessment on the property, collected in the same manner as real property taxes, for the purpose of repaying the loan. The special assessment constitutes a lien on the property senior to all other liens except real property taxes, with similar penalties for non-payment. During the application process the applicant must certify that such an assessment does not violate any existing lender agreements. Properties applying for PACE financing :
History In April 2010 the District of Columbia City Council enacted legislation providing for the creation of a PACE energy efficiency financing program within the District for residential, commercial, industrial, and other real property. The authorizing legislation describes a wide variety of energy efficiency improvement projects eligible under the program, such as insulation, building envelope improvements, HVAC system upgrades, and lighting. The law also permits PACE loans to be used to finance renewable energy projects (details not specified), as well as any other “modification, installation, retrofit, or remodeling approved as an electric or gas utility cost-savings measure”. Eligible Property Types:
Eligible Project Types:
| |||||||||||||||||||||||||||||||||||||||||||||||||
USDA - High Energy Cost Grant Program | USDA Rural Utilities Service | $10 million (2015 solicitation) | 06/09/16 | 05/24/22 | 4359 |
NOTE: The most recent solicitation for this program closed December 14, 2015. Please check the program website for information on future solicitations.
This grant program is not limited to renewable energy or energy conservation and efficiency measures, but these measures are eligible for this grant program. | ||||||||||||||||||||||||||||||||||||||||||||||||
Solar Energy System and Cogeneration System Personal Property Tax Credit | 03/09/21 | 05/24/22 | 5245 | The District of Columbia Council created a personal property tax exemption for solar energy systems and cogeneration systems within the District by enacting B19-0749 in December of 2012. Systems using exclusively solar energy as defined in § 34-1431(14)) are exempt from personal property tax; provided, that, notwithstanding any other provision of law, the Chief Financial Officer shall transfer $120,000 from the certified revenues deposited in the Renewable Energy Development Fund established by § 34-1436 to the unrestricted fund balance of the General Fund of the District of Columbia and shall recognize the $120,000 as local funds revenue in fiscal year 2013 and in each subsequent fiscal year. Eligible solar systems Solar energy is defined by D.C. Code § 34-1431 to mean "radiant energy, direct, diffuse, or reflected, received from the sun at wavelengths suitable for conversion into thermal, chemical, or electrical energy, that is collected, generated, or stored for use at a later time". This seemingly broad definition can include solar photovoltaics (PV), solar thermal, or any other energy technology that uses solar energy. Eligible cogeneration systems are defined as those which "produce both electric energy and steam or forms of useful energy which are used for industrial, commercial, heating or cooling purposes". | ||||||||||||||||||||||||||||||||||||||||||||||||||
FHA PowerSaver Loan Program | 03/07/16 | 05/24/22 | 5631 | Federal Housing Administration (FHA) through its PowerSaver loan program offers three financing options for homeowners to make energy efficiency and renewable energy upgrades in their residences. For all three PowerSaver products, borrowers must select from a list of approved PowerSaver lenders. Please check the HUD website to find a list of participating FHA approved lender for the program. PowerSaver products are not currently offered in all states, so all potential applicants are encouraged to first check the program website to ensure product availability in their location. Eligibility Homeowners must have following requirements to be eligible for the program:
Eligible Measures Eligible home energy upgrades include, but are not necessarily limited to, the following:
PowerSaver Home Energy Upgrade—Up to $7,500 This unsecured consumer loan is intended for smaller projects (e.g., insulation, air and duct sealing, water heating, replacing heating and cooling equipment, etc.). It does not require a home appraisal or lien on the property. Single-family homeowners may qualify for the loan if they have manageable debt and a credit score of 660 or higher. Interest rates vary, but typically range from 4.99% to 7.75%. PowerSaver participating lenders, markets, and contact information is available here. PowerSaver Second Mortgage (Title I)—Up to $25,000 This Title I loan is intended for financing larger retrofit projects, including energy efficiency, PV, solar hot water, geothermal, or other renewable energy projects. A home appraisal or equity is generally not required, but PowerSaver lenders may request it if required by their investor. Borrowers cannot currently have an existing home equity loan, a second lien, or second mortgage to qualify for this product. Interest rates vary but typically range from 4.99% to 9.99%, and the maximum loan term is 20 years. PowerSaver Title I participating lenders, markets, and contact information is available here. PowerSaver Energy Rehab (203(k))—First mortgage up to FHA loan limits This 203(k) loan is for home purchase or refinance, targeting either home buyers wishing to combine home improvements with a home purchases or to homeowners wishing to include home improvements when refinancing an existing mortgage. It is FHA-insured up to 100% for a home purchase or refinance, plus the cost of a home improvement project. Current loan limits for a single-unit property vary by area from $217,500 to $625,000 (higher amounts are permitted for two-, three- and four-unit properties); specific loan limits for an area can be found at this website. In order to qualify as a 203(k) PowerSaver loan, at least $3,500 of the home improvements must consist of eligible PowerSaver measures. PowerSaver 203(k) participating lenders, markets, and contact information is available here. The two types of PowerSaver 203(k) loans are Standard and Streamlined. Standard 203(k) loans are for major improvements, where a home improvement project costs at least $5,000 and includes $3,500 in energy upgrades. The Streamlined 203(k) loans are for minor home improvements, where the home improvement project cost must not exceed $35,000. A HUD consultant is only required for oversight of home improvements for Standard 203(k) loans. | ||||||||||||||||||||||||||||||||||||||||||||||||||
Solar Renewable Energy Credits | 03/09/21 | 05/24/22 | 5686 | In January 2005, the District of Columbia (D.C.) Council enacted a Renewable Portfolio Standard (RPS) with a solar carve-out that applies to all retail electricity sales in the District. In October 2008 the RPS was amended by the Clean and Affordable Energy Act (CAEA) of 2008. Significantly, this legislation increased the percentage and number of benchmarks that utilities must meet, included solar water heating as an eligible technology, increased the alternative compliance payment and amended reporting requirements. The solar requirements began in 2007 at 0.005% of retail electricity sales and increase annually towards an ultimate target of 2.50% solar by 2023. Notably, both solar-electric and solar thermal resources are eligible for the solar carve-out. Under D.C. law, a solar renewable energy credit (SREC), is equivalent to one megawatt-hour (MWh) of electricity derived from an eligible solar resource. Electricity suppliers must purchase SRECs in order to meet their compliance obligations under the law, or pay a Solar Alternative Compliance Payment (SACP) for any shortfalls in SREC purchases. The SACP operates as a ceiling on the price that a supplier would pay for SRECs used for compliance with the D.C. RPS. The SACP is set at a flat rate of $500 per MWh for 2016 -2023, $400 per MWh for 2024 - 2028, $300 per MWh for 2029 - 2041, and $100 per MWh for 2042 and thereafter. The value of an SREC varies based on market conditions. In D.C., net metering customers retain ownership of SRECs (or RECs) unless they agree to transfer them. A generator remains eligible to generate SRECs for as long as the facility remains certified as an eligible generator. SRECs have a three-year lifetime from the date they are created. In other words, an SREC may generally be used (i.e., retired) for compliance by an obligated electricity supplier for up to three years after the date it is created. An obligated entity may use an SREC to comply with the solar carve-out of the RPS or with the general renewables requirement. As of September 2014, total of 1,174 solar PV, 74 solar thermal system inside D.C. and 2,239 solar energy systems outside of D.C. were eligible to meet the city’s RPS requirement. In order to begin producing D.C.-eligible SRECs, generators must be certified by the D.C. Public Service Commission (PSC) as an eligible generator. In order to qualify as an eligible generator, solar facilities must be located within the District of Columbia or in locations served by a distribution feeder serving the District of Columbia. SRECs generated by solar energy facilities that were certified by the PSC prior to February 1, 2011, are excluded from this requirement and are allowed to be used to meet the RPS solar requirement.* When the generator has been issued a certification number, they may create an account with the PJM GATS. The PJM GATS is used to track the generation and transfer of SRECs from an eligible facility. SRECs are created in the GATS based on energy production meter readings uploaded to the system by the generator. Solar PV facilities of 10 kilowatts (kW) or less and solar thermal facilities which produce or displace less than 10,000 kilowatt-hours (kWh) per year are permitted to use an engineering estimate to generate SRECs rather metered generation data. SRECs are awarded to Solar Thermal based on their kWh savings at the ratio 3,412 BTUs = 1kWh. Solar thermal systems or collectors must be certified by the SRCC in order to qualify for the standard.** Background Amendments made in 2010 by D.C. Law 18-0223 have clarified the eligibility of solar thermal facilities located within the District, and geographic eligibility of renewable (including solar) resources in general. Further amendments were made by D.C. Law 18-0303 in March 2011 to clarify the certification requirements for non-residential solar thermal systems. In August of 2011, the RPS was further amended by both the Emergency Distributed Generation Amendment Act of 2011 (B19-0384), and the Distributed Generation Amendment Act (B19-10), which increased the solar carve out from 0.4% to 2.50% by 2023. Following a Congressional Review Period, The Distributed Generation Amendment Act became D.C. Law 19-36 on October 20, 2011. The changes resulting from before mentioned legislation are reflected in the D.C. Code § 34-1432. * Prior to D.C. Law 19-36, eligible generator solar facilities were allowed to be located within the PJM Interconnection region or a state adjacent to the PJM Interconnections region. This portion of the law was amended by D.C. Law 18-0223 in July 2010 to remove confusing language pertaining to RECs associated with electricity delivered into the PJM Interconnection region from an adjacent control area. These terms are defined in greater detail in the rules adopted by the PSC. ** This portion of the law was amended on a by D.C. Law 18-0303 in March 2011 to revise language associated with certification requirements for non-residential solar thermal systems. The prior wording of the law required all non-residential solar thermal systems to be SRCC certified without making a distinction between the collectors (i.e., SRCC OG-100) and the system (i.e., SRCC OG-300). The revised language makes this distinction, clearing the way for non-residential systems to be certified as eligible for the standard. | ||||||||||||||||||||||||||||||||||||||||||||||||||
Fannie Mae Green Financing – Loan Program | 05/08/20 | 05/24/22 | 5780 | NOTE: Only multifamily properties are eligible for the program. Single family homeowners are not eligible for this program. The Fannie Mae Green Financing Business provides mortgage financing to apartment buildings and cooperatives (with 5 or more units) to finance energy and water efficiency property improvements. Its green financing programs include Green Rewards, and preferential pricing for loans secured by a property with an eligible Green Building Certification. All Fannie Mae green loans are securitized as Green Mortgage Backed Securities (Green MBS). To learn more about these programs, multifamily property owners should coordinate with a Fannie Mae DUS Lender: https://multifamily.fanniemae.com/about-multifamily/our-partners/dus-lenders Green Rewards, launched in 2015, provides preferential pricing and up to an additional 5% of loan proceeds by including up to 75% of projected owner energy and water savings and 25% of projected tenant savings in the loan underwriting. Conventional and affordable multifamily properties, as well as cooperatives, seniors, military, and student housing properties are eligible for this program. To qualify for a Green Rewards loan the property owner must commit to making property improvements that are projected to reduce the whole property’s annual energy and water consumption by at least 30%, which a minimum of 15% must be attributable to savings in energy consumption. Properties may be located anywhere in US, and the selected property upgrades must be completed within 12 months of loan closing. Fannie Mae also provides preferential pricing for an acquisition or refinance loan on a conventional or affordable property that has a current, eligible Green Building Certification per Fannie Mae Form 4250. Please visit the Fannie Mae Green Financing website for more information and detailed program requirements. |